Kitchen Remodeling
We Honey Do remodels kitchens across the Puget Sound region for homeowners and property managers. The work covers layout changes, cabinetry, countertops, backsplash, flooring, lighting and appliance rough-in, from a facelift to a full gut. People call when the layout fights them or the finishes have aged out.
Kitchen Remodeling Contractor Covering All Puget Sound Since 2007
Most kitchen remodels start with a layout problem rather than a taste problem. The dishwasher blocks a drawer, there is nowhere to put down a bag of groceries, two people cannot work in the room at once. We Honey Do scopes what is actually causing that before deciding how much has to come out.
That distinction sets the budget more than any finish selection does. A kitchen where the sink, range and refrigerator stay put is a different project from one where they move, because moving them means plumbing, gas and electrical, which means permits and inspections. Older kitchens add their own constraint: original layouts were designed around smaller appliances and lighter electrical loads, so a modern range or a second oven can require circuit work nobody budgeted for.
Structural and load-bearing changes, including taking out a wall to open the kitchen to another room, need an engineer’s involvement before we price them, and we will say so at the walk rather than guess.
Considerations & Options
The estimate names each element separately, so you can see what a given selection adds. A kitchen can be one of these or all six.
Cabinetry
Countertops and backsplash
Flooring
Lighting and electrical
Appliances & plumbing
Pulling A Kitchen In a Home Built Before 1978
Taking out old cabinets, old flooring and old wall surfaces disturbs a large amount of painted material at once, and paint applied before 1978 can contain lead. We Honey Do is an EPA and HUD certified lead paint renovation contractor, which is the credential that governs how that demolition is contained, performed and cleaned up.
A kitchen is the worst room for this to be handled casually, because it is where food is prepared and because the space usually stays connected to the rest of the house. Containment separates the work area, dust is controlled at the source rather than swept up afterwards, and the cleanup is verified before the space goes back into use. Tell the office the approximate year the home was built when you request the estimate.
What Is Involved With Remodeling A Kitchen?
- 01Walk the space and confirm exactly what is changing
- 02Produce the scope, the layout and the selections list
- 03Pricing the job & estimate approval
- 04Pull any permits the work requires
- 05Protect the rest of the home and set up containment
- 06Demolition and removal
- 07Electrical, plumbing and framing rough-in, then inspection
- 08abinets, countertops, backsplash, flooring and fixtures
- 09Final inspection, walkthrough and punch list
What Affects The Cost Of Remodeling My Home?
- 01Kitchen size and total cabinet run length
- 02Whether the layout changes or stays put
- 03Moving plumbing, gas or electricalMoving existing plumbing, gas or electrical systems
- 04Cabinetry: stock, semi-custom, custom or refacing
- 05Countertop material, edge detail and cutouts
- 06Backsplash material, area and pattern
- 07Appliance selections and any new rough-in they need
- 08Flooring and the transitions into adjoining rooms
- 09Lighting changes and added circuits
- 10Permits and the inspections they trigger
- 11Lead-safe containment in a home built before 1978
- 12What demolition uncovers behind the cabinets
Does Your Kitchen Need A Facelift Or A Full Remodel?
Whether the layout moves is the question that decides this, not the condition of the finishes. This table is a starting point, not a substitute for looking at the actual kitchen.
| Element | A repair may be enough when | A full remodel is likely when | What to send |
|---|---|---|---|
| Layout | The sink, range and refrigerator stay where they are | Any of the three moves, or a wall is opening up | A photo from each corner, plus rough dimensions |
| Cabinets | Boxes are solid and only the doors and finish have aged | Boxes are failing, or the run has to change to fit a new layout | A close photo of a door, a drawer and a corner |
| Countertops | The existing run works and only the surface is dated | The run changes length or the sink cutout moves | The current material and the run length |
| Plumbing & Electrical | Everything stays on its existing connection | Fixtures move, or the appliance load needs new circuits |
What appliances you are planning, and the panel location |
| Timeline | You need the kitchen back quickly | You can plan around a longer displacement |
Any date you are working towards |
What Our Customers Say
Will call again. Liz from We Honey Do was super responsive, and gave us a detailed estimate and solid idea of the work involved.
The technicians Jake and Logan were very polite, professional, and knowledgeable.
Thank you for all the work you did for me. My home turned out beautifully.
Related Services
These services are often ordered with kitchen remodels.
Whole Home Renovation
Bathroom Remodeling
Interior Painting
Carpentry and Trim Work
Drywall Repair
Property Maintenance
How long will I be without a kitchen?
It depends on whether the layout moves and on cabinetry lead time, which is usually the longest item in the schedule. A facelift is measured in days to a couple of weeks. A full remodel runs longer, and the gap between cabinet install and countertop install is a built-in part of it. The estimate gives an expected duration with both accounted for.
Do I need a permit for a kitchen remodel?
If plumbing, gas or electrical is moving or being added, or if framing changes, generally yes. If everything stays on its existing connection and it is a like-for-like replacement, generally no. Requirements vary by jurisdiction. We Honey Do pulls the permits for the work it performs, and the estimate names which ones your kitchen needs.
Can you keep my layout and just replace the finishes?
Yes, and it is usually the better value when the layout already works. Keeping the sink, range and refrigerator on their existing connections avoids the plumbing and electrical work that drives both the cost and the permit requirement. The facelift or full remodel table on this page shows where that line falls.
Do you supply the cabinets and countertops, or do I?
Either. The estimate is written to show which items we are supplying and which you are, because that changes both the price and who carries the lead time risk. If you are supplying, tell the office at the walk so the schedule is built around your delivery dates.
What happens if you find something behind the cabinets?
The office tells you what was found, what it changes and what it costs, before the crew continues. Old water damage under the sink, undersized electrical and framing that does not match the drawings are the three most common. As a general contractor we can absorb those into the existing scope rather than stopping while you find another trade.
My house was built before 1978. Does that change anything?
Yes. Pulling cabinets, flooring and wall surfaces disturbs a lot of painted material, and pre-1978 paint can contain lead. We Honey Do is an EPA and HUD certified lead paint renovation contractor, so containment, work practices and cleanup are built into the scope. Tell the office the approximate build year when you request the estimate.
Do you handle the electrical and plumbing yourselves?
In-scope work under the permit we hold is handled by our crews. Regulated work beyond that goes to the licensed specialist for that trade, coordinated by us rather than by you. The estimate says which is which before the job starts.
Request a Kitchen Remodeling Estimate
Send a photo from each corner of the room, rough dimensions, and the approximate year the home was built. Say whether the sink, range or refrigerator are moving, because that single answer changes the scope more than any other.
More than 50,000 customers served since 2007. Estimates are free with no obligation, the work carries a 100 percent satisfaction guarantee, and estimates and scheduling are available in Spanish.