Opens in a new tab

Kitchen Remodeling

We Honey Do remodels kitchens across the Puget Sound region for homeowners and property managers. The work covers layout changes, cabinetry, countertops, backsplash, flooring, lighting and appliance rough-in, from a facelift to a full gut. People call when the layout fights them or the finishes have aged out. 

Kitchen Remodeling Contractor Covering All Puget Sound Since 2007

Most kitchen remodels start with a layout problem rather than a taste problem. The dishwasher blocks a drawer, there is nowhere to put down a bag of groceries, two people cannot work in the room at once. We Honey Do scopes what is actually causing that before deciding how much has to come out.

That distinction sets the budget more than any finish selection does. A kitchen where the sink, range and refrigerator stay put is a different project from one where they move, because moving them means plumbing, gas and electrical, which means permits and inspections. Older kitchens add their own constraint: original layouts were designed around smaller appliances and lighter electrical loads, so a modern range or a second oven can require circuit work nobody budgeted for.


Structural and load-bearing changes, including taking out a wall to open the kitchen to another room, need an engineer’s involvement before we price them, and we will say so at the walk rather than guess.

Considerations & Options

The estimate names each element separately, so you can see what a given selection adds. A kitchen can be one of these or all six.

Layout and space planning

Where the sink, range, refrigerator and prep space sit, and what has to move behind the walls to put them there.

Cabinetry

Stock, semi-custom or custom cabinets, refacing where the boxes are sound, and the fillers and scribes that make a run fit a wall that is not square.

Countertops and backsplash

Granite, marble, quartz and other surfaces, templated after the cabinets are set, with the backsplash to finish it off.

Flooring

Replacement flooring through the kitchen, including the transitions into adjoining rooms and the toe kick and trim it meets.

Lighting and electrical

Task, ambient and under-cabinet lighting, added circuits where the appliance load requires them, and outlet placement that matches the new layout.

Appliances & plumbing

Appliance fit, clearance and rough-in, sink and dishwasher connections, and any gas or water line work the new layout requires.

Pulling A Kitchen In a Home Built Before 1978

Taking out old cabinets, old flooring and old wall surfaces disturbs a large amount of painted material at once, and paint applied before 1978 can contain lead. We Honey Do is an EPA and HUD certified lead paint renovation contractor, which is the credential that governs how that demolition is contained, performed and cleaned up.

A kitchen is the worst room for this to be handled casually, because it is where food is prepared and because the space usually stays connected to the rest of the house. Containment separates the work area, dust is controlled at the source rather than swept up afterwards, and the cleanup is verified before the space goes back into use. Tell the office the approximate year the home was built when you request the estimate.

What Is Involved With Remodeling A Kitchen?

A facelift uses a handful of these. A full remodel uses all nine. The approved estimate says which stages yours includes.
Timelines. Countertops are templated after the cabinets are set, not before, because the template has to match the boxes as installed rather than the drawing. That creates a known gap between cabinet install and countertop install, and the schedule in your estimate accounts for it rather than treating it as a delay.
  1. 01
    Walk the space and confirm exactly what is changing
  2. 02
    Produce the scope, the layout and the selections list
  3. 03
    Pricing the job & estimate approval
  4. 04
    Pull any permits the work requires
  5. 05
    Protect the rest of the home and set up containment
  6. 06
    Demolition and removal
  7. 07
    Electrical, plumbing and framing rough-in, then inspection
  8. 08
    abinets, countertops, backsplash, flooring and fixtures
  9. 09
    Final inspection, walkthrough and punch list

What Affects The Cost Of Remodeling My Home?

A kitchen is priced from the cabinet run, the scope of the systems work and the selections, never a flat per-kitchen number. We Honey Do quotes from these factors, and the estimate is free with no obligation.
  1. 01
    Kitchen size and total cabinet run length
  2. 02
    Whether the layout changes or stays put
  3. 03
    Moving plumbing, gas or electricalMoving existing plumbing, gas or electrical systems
  4. 04
    Cabinetry: stock, semi-custom, custom or refacing
  5. 05
    Countertop material, edge detail and cutouts
  6. 06
    Backsplash material, area and pattern
  7. 07
    Appliance selections and any new rough-in they need
  8. 08
    Flooring and the transitions into adjoining rooms
  9. 09
    Lighting changes and added circuits
  10. 10
    Permits and the inspections they trigger
  11. 11
    Lead-safe containment in a home built before 1978
  12. 12
    What demolition uncovers behind the cabinets

Does Your Kitchen Need A Facelift Or A Full Remodel?

Whether the layout moves is the question that decides this, not the condition of the finishes. This table is a starting point, not a substitute for looking at the actual kitchen.

Carpentry Trim repair or replacement considerations
Element A repair may be enough when A full remodel is likely when What to send
Layout The sink, range and refrigerator stay where they are Any of the three moves, or a wall is opening up A photo from each corner, plus rough dimensions
Cabinets Boxes are solid and only the doors and finish have aged Boxes are failing, or the run has to change to fit a new layout A close photo of a door, a drawer and a corner
Countertops The existing run works and only the surface is dated The run changes length or the sink cutout moves The current material and the run length
Plumbing & Electrical Everything stays on its existing connection Fixtures move, or the appliance load needs new circuits

What appliances you are planning, and the panel location

 Timeline You need the kitchen back quickly You can plan around a longer displacement

Any date you are working towards

What Our Customers Say

Don't take our word for it....
Will call again. Liz from We Honey Do was super responsive, and gave us a detailed estimate and solid idea of the work involved.
Shannon G.
The technicians Jake and Logan were very polite, professional, and knowledgeable.
Kerri O.
Thank you for all the work you did for me. My home turned out beautifully.
Karen M.

Related Services

These services are often ordered with kitchen remodels.

Kitchen Remodeling FAQs

Timelines, permits, selections and getting started.
(425) 775-6123

It depends on whether the layout moves and on cabinetry lead time, which is usually the longest item in the schedule. A facelift is measured in days to a couple of weeks. A full remodel runs longer, and the gap between cabinet install and countertop install is a built-in part of it. The estimate gives an expected duration with both accounted for.

If plumbing, gas or electrical is moving or being added, or if framing changes, generally yes. If everything stays on its existing connection and it is a like-for-like replacement, generally no. Requirements vary by jurisdiction. We Honey Do pulls the permits for the work it performs, and the estimate names which ones your kitchen needs.

Yes, and it is usually the better value when the layout already works. Keeping the sink, range and refrigerator on their existing connections avoids the plumbing and electrical work that drives both the cost and the permit requirement. The facelift or full remodel table on this page shows where that line falls.

Either. The estimate is written to show which items we are supplying and which you are, because that changes both the price and who carries the lead time risk. If you are supplying, tell the office at the walk so the schedule is built around your delivery dates.

The office tells you what was found, what it changes and what it costs, before the crew continues. Old water damage under the sink, undersized electrical and framing that does not match the drawings are the three most common. As a general contractor we can absorb those into the existing scope rather than stopping while you find another trade.

Yes. Pulling cabinets, flooring and wall surfaces disturbs a lot of painted material, and pre-1978 paint can contain lead. We Honey Do is an EPA and HUD certified lead paint renovation contractor, so containment, work practices and cleanup are built into the scope. Tell the office the approximate build year when you request the estimate.

In-scope work under the permit we hold is handled by our crews. Regulated work beyond that goes to the licensed specialist for that trade, coordinated by us rather than by you. The estimate says which is which before the job starts.

Request a Kitchen Remodeling Estimate

Send a photo from each corner of the room, rough dimensions, and the approximate year the home was built. Say whether the sink, range or refrigerator are moving, because that single answer changes the scope more than any other.

More than 50,000 customers served since 2007. Estimates are free with no obligation, the work carries a 100 percent satisfaction guarantee, and estimates and scheduling are available in Spanish.